Avalokana

Civil Engineering

Ancient Surveying

9:30 AM

Civil Department

Technical

RULES

  • Type: Group (Maximum 5 members)
  • Avalokana is the ancient method of surveying accurately without any use of measuring equipment by proper vision and common sense.
  • Preliminary rounds may be conducted depending on the number of registered teams.
  • Shortlisted teams will be allowed to field for participating in final foundation marking.
  • Basic line diagram will be provided to each team.
  • Only marking powder, arrows and rope of specific length will be provided.
  • No other Surveying instruments are provided/allowed in the field.
  • Electronic gadgets / devices are strictly prohibited.
  • Time duration will be 150 minutes
  • Evaluation is based on neatness, accuracy and proper alignment on the ground.
  • The decisions of the judges are final and irrevocable.

sode-edu.in