Avalokana
Civil Engineering
Ancient Surveying
9:30 AM
Civil Department
Technical
RULES
- Type: Group (Maximum 5 members)
-
Avalokana is the ancient method of surveying accurately without any use of
measuring equipment by proper vision and common sense.
-
Preliminary rounds may be conducted depending on the number of registered
teams.
-
Shortlisted teams will be allowed to field for participating in final foundation
marking.
-
Basic line diagram will be provided to each team.
-
Only marking powder, arrows and rope of specific length will be provided.
-
No other Surveying instruments are provided/allowed in the field.
-
Electronic gadgets / devices are strictly prohibited.
-
Time duration will be 150 minutes
-
Evaluation is based on neatness, accuracy and proper alignment on the
ground.
-
The decisions of the judges are final and irrevocable.
sode-edu.in